[Construction Case] Slab Foundation House: Settlement Correction Work (Kanagawa Prefecture)

Even in cases where the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.

We would like to introduce a case of "settlement correction work" carried out at a certain house with a flat foundation in Kanagawa Prefecture. Due to a maximum settlement of 66mm observed in one corner of the living room, polyurethane resin was injected under the flat foundation to implement the settlement correction. This time, the work was performed in a house with very limited space between neighboring properties, but our company can carry out the work without the need for extensive construction, allowing for a short construction period without affecting the neighboring property. 【Case Overview】 ■ Construction Area: 40m2 ■ Maximum Settlement Amount: 66mm ■ Area: Certain residence in Kanagawa Prefecture ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Tottori Prefecture)

No need for large-scale demolition work! Here we present a case where a settlement of up to 46mm was corrected.

Here is an example of "settlement correction work" carried out on a slab foundation house in Unnan City, Tottori Prefecture. Due to a maximum settlement of 46mm observed, resin was injected under the slab foundation to implement the correction. The company was chosen because the correction could be made without large-scale demolition work or moving. 【Case Overview】 ■ Construction Area: Approximately 106m2 ■ Maximum Settlement Amount: 46mm ■ Area: Unnan City, Tottori Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration